Some Highway Projects executed by us:
NO. | Project | Client | Status | ||
HIGHWAYS | |||||
1 | Emergency Repairs of the washout at Km 2 Isua along Ibillo (Edo State Border) – Ikare-Irun (Ekiti State Border) Route No. 553(F220) (2017) | Federal Ministry of Power, Works and Housing, Abuja | Completed | ||
2 | Construction of Ajase- Ipo/Offa/Erin-Ile/Osun State Boundary Road (Section 1 Ch0+000 – Ch8+000)(2014) | Federal Ministry of Works, Abuja. | Ongoing | ||
3 | Rehabilitation of Uba – Askira – Mbalala Road in Borno State (2010) | Federal Ministry of Works, Abuja. | Completed | ||
4 | Periodic Maintenance of Hung – Mubi Road in Adamawa State (2011) | Road Sector Development Team (RSDT – World Bank Assisted), Federal Ministry of Works Abuja. | Completed | ||
5 | Periodic Maintenance of Takai – Takai–Albasu–Gaya Road in Kano State (In Association with Heriprom Engineering Ltd.) (2011) | Road Sector Development Team (RSDT – World Bank Assisted), Federal Ministry of Works Abuja. | Completed | ||
6 | Maintenance Repairs by Retainership of Mokwa-Bida- Lapai-Lambata Road in Niger State (2007) | Federal Roads Maintenance Agency, Abuja | Completed | ||
7 | Major Maintenance of Birnin Gwari – Kaduna Road in Kaduna State (2009) | Federal Roads Maintenance Agency, Abuja | Completed | ||
8 | Emergency Repairs of Tegina Birnin-Gwari-Kaduna State Border Road; Km 0+000 to Kaduna State Border, Tegina, Km.82+000 in Niger State (2012) | Federal Ministry of Works, Abuja. | Completed | ||
9 | Emergency Repairs of Aba- Azumini Road Km 17+000 to Km.21+600 in Abia State for the Operation Zero Pothole Programme. (2012) | Federal Roads Maintenance Agency, Abuja | Completed | ||
10 | Maintenance Repairs by Retainership of Bida-Wushishi-Zungeru Road in Niger State. (2006) | Federal Roads Maintenance Agency, Abuja. | Completed | ||
11 | Construction of Main Internal Road Network at Industrial Development Centre, Oshogbo for Oak Electric Nig. Ltd. (2006) | Federal Ministry of Industries, Abuja. | Completed | ||
12 | Construction of Drainages/Perimeter Survey Maps/Layout Plan for Estate/Topographical Map at Industrial Development Centre, Oshogbo for Elvino Nig. Ltd. (2006) | Federal Ministry of Industries, Abuja. | Completed | ||
13 | Construction of Secondary Internal Road Network at Industrial Development Centre, Oshogbo for Oak Electric Nig. Ltd. (2006) | Federal Ministry of Industries, Abuja. | Completed | ||
Bridges and Hydraulic Structures | |||||
14 | Rehabilitation of Bridge at km 37 across Ogun River along Maya-Iseyin Road, Oyo State. (2018) | Federal Ministry of Power, Works and Housing, Abuja | On-going | ||
15 | Construction of Ojutu bridge in Illobu – Osun State (2017) | Federal Ministry of Power, Works and Housing, Abuja | On-going | ||
16 | Construction of a Diversion Culvert at the Shiroro Dam Site. (2018) | North South Power Co. Ltd | Completed | ||
17 | Reinstatement of Collapse Transition Slab (Bida End) of Wuye Bridge Km.23+000 Along Bida-Mokwa Road Route No. 55 in Niger State (2012) | Federal Roads Maintenance Agency, Abuja | Completed | ||
18 | Emergency Repairs of Embankment Washout and Collapsed Apron at Km.2+150 RHS (3mx3mx3m) Box Culvert on River Lazu (Bida Township) and Approach Road Along Bida – Lapai Road Route No. 55 in Niger State. (2012) | Federal Roads Maintenance Agency, Abuja | Completed | ||
Fabrication Works/ Water Supply | |||||
19 | Powerhouse Water Supply Project at Shiroro Power Station, Niger State. (2019) | North South Power Co. Ltd. | On-going | ||
20 | Fabrication of stop logs and supply of construction equipment and materials for the repair of unit 411G4 intake at Shiroro Hydroelectric power station(2015) | North South Power Co. Ltd. | Completed | ||
21 | Fabrication of stop logs and other steel structures and supply of Equipment for North South Power Ltd. (2015) | North South Power Ltd. | Completed | ||
Erosion/Flood/Vegetation Control Projects | |||||
22 | Vegetation Control of Kabba-Obajana-Section of Kabba-Lokoja Road in Kogi State and Share-Lafiagi-Patigi Road in Kwara State. (2007) | Federal Roads Maintenance Agency, Abuja | Completed | ||
23 | Iloro Ego-Igbanasa-Owo Flood Control Project in Owo Town, Owo LGA, Ondo State. (2013) | Federal Ministry of Environment, Abuja. | Completed | ||
24 | Adebayo Ighole Erosion Control Project, Ilorin, Kwara State (2012) | Federal Ministry of Environment, Abuja. | Completed | ||
Installation of Street Lights | |||||
25 | Installation of Streetlights on Badagry Expressway, Orile – Mile 2, Festac Roads in Lagos State. (2008) | Federal Ministry of Transportation, Abuja. | Completed | ||
Building and Structures | |||||
26 | Construction of Shopping Mall of 43 Offices on 4 Floors and 2,000m2 of Warehouse Space for Kazaash Nig. Ltd. at Kabusa District, Abuja. (2007) | Kazaash Nig. Ltd. | Phase 1 Completed | ||
27 | Comprehensive Development of Bankys Private School Involving 6 Multistorey Structures (2013) | Bankys Private School, Abuja. | Phase 1 Completed | ||
28 | Rehabilitation of Failed Sections and Repairs of Leakages on Skye Bank Plc., Jalingo Branch in Taraba State (2014) | Skye Bank Plc | Completed | ||
29 | Construction of Zonal Education Office at Gwagwalada, FCT. (2009) | Federal Capital Territory Administration | Completed | ||
30 | Construction of One (1) Unit of Two Bedroom Bungalow and One (1) Unit of Three Bedroom Bungalow in Bayelsa State (2010) | Ministry of Niger Delta Affairs | Completed | ||
31 | Construction of a Classroom Block in Osun State for Quickwins MDGs Projects (2009) | State House, Abuja | Completed | ||
32 | Construction of Classroom Blocks in Osun State for Quickwins MDGs Projects (2008) | State House, Abuja | Completed | ||
33 | Construction of a Computer Centre in Lagos State for Quickwins MDGs Projects (2009) | State House, Abuja | Completed | ||
34 | Construction of Several Residential Buildings. (2004 – 2010) | Several Individuals | Completed | ||
35 | Construction of Church Auditorium & Pastorate for Glory Covenant Christian Centre, Ibadan. (2006) | Glory Covenant Christian Centre, Ibadan | Completed |